Multiuse Trail at Clairmont Campus—First Project with PATH

  • Clairmont Campus multiuse trail construction 1
  • Clairmont Campus multiuse trail construction 2
  • Clairmont Campus multiuse trail construction 3
  • Clairmont Campus multiuse trail construction 4
  • Clairmont Campus multiuse trail construction 5

Emory partnered with the PATH Foundation on an important multiuse trail connection between PATH’s existing South Peachtree Creek trail network on the east side of Clairmont Road (Medlock Park and beyond) and Emory’s Clairmont Campus. This was Emory’s first partnership with the PATH Foundation, a short but significant trail link between Emory and PATH’s larger network.

The paved trail, which runs under Clairmont Road at Peachtree Creek, allows bicyclists and pedestrians to avoid crossing busy Clairmont Road at grade.

The path runs parallel to Clairmont Road and connects with existing bike lanes and sidewalks on Starvine Way on Emory’s Clairmont Campus. Additional multiuse trails are planned through the Clairmont Campus that will connect to the trail network to the main campus.